Web-Based ERP Expert Home 简体版   繁體版   ENGLISH
·Company profile
·Client information
·Introduction
-Production Management System
-Sales Management System
-Purchasing Management System
-Warehouse Management System
-Financial system
-HR Management System
·Demo
·Consultation
-Telephone meeting
-Meet in person
-Self-try demo
·After service
·Privacy policy
·Terms of use
·Terms and condition
·Support
·ERP newest technology
·Recruitment
·Contact us
 
Your position now:Home>Introduction
Introduction〕The Bill of Material (BOMs) routing list is vital to the MPRII system as they illustrate the structures of products. The success of MPRII can be directly affected since all procedures in the workflow such as the standard of production procedures; product quality and packaging, etc are involved.
  Function Highlights
   
             

Generate P.O. in accordance with inventory level and supplier database through the material requisition plan.
Maintain a comprehensive database of suppliers and facilitate purchasers to make reference on prices, delivery cycles and payment terms prior issuing orders.

Monitor the execution of P.O. and keep track the processing status accurately all the times
 Provide  Purchase Request List  to decide from the sales order to Generate P.O
Provide Goods Receiving Advice e.g. a warehouse superintendent checks the stock balance after receiving the Goods Receiving Advice from Purchasing Dept. and keeps stock records.。
 Provide information of supplier quotations and tele-quotation in the form of bill to entry and stored in your computer anytime.

           
  Routing
   
Record the information of every working center during the process of material value adding. The route of the value adding procedures and management separately determines the settings of different materials in each working center. Those related information such as value added implementation, manufacturing procedures, tools, materials, assembly BOM, production batches, standards of spare part installation, cost structure, total consumption of man power for production are determined. Resources consumption level can be set so as to ease the analysis of resources requirement.
   
  Feature Highlights
   

BOM is a list of descriptions on assembly structure consisting al the sub-assembly, spare parts, material listing and the quantity and consumption ratio of material for those assemblies.
   
The system allows instant review of the production plan and its status of working centers, understanding the progress as well as it efficiency; it also provides a clearer picture of all working centers.

  Advantages
   
Intelligent multi-level BOM - strengthens flow by graph processing
Intelligent material demand monitoring – includes monitoring of purchasing quantity, warehouse quantity, quantity under QC and production quantity.
Intelligent production list – analyzes material demand and makes effective production planning.
Comprehensive control of production flow and time monitoring.
Improves production efficiency and controls production cost.

Unit 12, 6th Floor, Tower B, New Trade Plaza, 6 On Ping Street, Shatin, N.T., Hong Kong
Tel:(852)2637 2221 Fax:(852)2541 1535
  Unit 1519,30th floor, International Trade Building,No. 3002 South Road,Luohu District,ShenZhen China.
Tel:(0755) 2779 0102 / 27913682